Ongoing & Completed Projects


Royal Pacific Resort Guestroom Renovation - Loews Universal Orlando
Royal Pacific Resort - Renovation of 1000 guestrooms & Corridors
Jacobs Engineering
Tatro Construction is providing Construction Management Services to Jacobs Engineering on the oversite of two Federal Bureau of Prison projects which began construction in the fall of 2008.  This $1.3 Million Dollar contract is for CM oversite of the new FBOP facility in Berlin, New Hampshire and Aliceville, Alabama.  Construction of both Prison facilities is expected to be complete in the fall of 2010.
element Store, Universal Studios City Walk Orlando FL.
Renovation of the Element Store Universal Studios City Walk Orlando FL
Ritz Carlton Guestroom Renovation Key Biscayne, FL.
Ritz Carlton Renovated Guestroom











The renovation of the Ritz Carlton in Key Biscayne, FL.  will begin in July 2008.  Projects scope is the renovation of all 489 Guestrooms, Condo Suites and corridors. The interior renovation is a fast track project consisting of interior paint, new FF&E, bedroom carpet, wall coverings, new furniture, new Kitchen cabinets and granite, FF&E moving and storage, new window coverings and corridor carpet. The Ritz Carlton is scheduled to be complete by mid December 2008.

Ritz Carlton, Key Biscayne FL.
Swan Hotel Guestroom Renovation - Tishman Hotel Corporation
Swan Hotel Guestroom Renovation
Swan Hotel Guestroom Renovation - 747 Guestrooms
The Swan Hotel features 747 deluxe guestrooms owned and operated by the Tishman Hotel Corporation.  The renovation is a fast track project consisting of new drywall, texture, pain, carpet, polished counter tops, reupholstering furniture, FF&E moving & storage, new window coverings and TV's.  Additionally the scope is to remove and replace 165 old fan coil units and riser piping on several levels of the hotel.  Schedule consists of renovating approximately 65 rooms every two weeks while keeping the hotel open and completely functional.  All guestrooms are scheduled to be completed by December 2007.
Universal Express Pass Modifications - Universal Studios
Universal Express Pass
Universal Express Pass
Orlando Repertory Theatre Renovation
Orlando Repertory Theatre

The Renovation of the Orlando Repertory Theatre began in June 2006.  The scope of work includes the demolition of the existing aluminum theatre seating and railings.  A new structural foam theatre riser system will be installed with an integral colored concrete topping.  The end result will house 348 premium seats with little to no site line issues for viewing.  Additionally, the entire roofing and flashings are being replaced with new modified bitumen roofing system and new metal flashings.  Completion of the theatre is scheduled for October 2006 with the re-roofing project completing the end of November 2006.


New Stadium Seating at the Orlando Repertory Theatre
Orlando Repertory Theatre Concrete Risers

Universal's Hard Rock Hotel Guestroom Suite & Corridor Renovation - Universal Orlando


Hard Rock Hotel at Universal Studios in Orlando Florida features 650 deluxe guestrooms and suites.  The renovation is a fast track project consisting of new paint, carpet, granite countertops, reupholstered furniture, FF&E moving and storage, new window coverings, bathroom fixtures and plasma TV’s.  Schedule consists of taking down and renovating approximately 70 rooms a week keeping the remaining use of the hotel open and completely functional.  All guestrooms and corridors were completed by November 2006.  Total Schedule duration is 10 weeks.


Pre-Construction Services began in early March 2006 and and continued through October 2006.   Pre-Construction services include project CPM scheduling, cost and budget reviews, purchasing and bid packaging , value engineeringarchitectural review and design coordination with the buildings and rides.  The Hard Rock Park grand opening was summer 2008.

 


Tatro Construction performs the overall Construction Management for each project with  oversight of the onsite construction activities with the General Contractor; additionally Tatro provides as a liaison between the GEO Group and the State of Florida.  Schedule reviews, change order reviews, budget analysis, and State Compliance are among a few of the duties performed for The GEO Group, Inc.    

 


The Geo Group
CM Services - The Geo Group Graceville Correctional Facility